By considering the given time frame, we were unable to complete all areas that we are like to do. So, there is a lot of opportunity to study further about this project. Some of the areas that we are identified is given as future work here.

  • Seawater pumped hydro model require more accurate measurements and calculations. Also, need to address challenges like installation and cost of construction for the seawater pumped hydro.
  • The project required to investigate the risks and possible environmental impact in the island.        
  • The project requires to analysis on the available grants from the government to reduce capital investments.
  •  Detailed economic analysis such as the maintenance and operating costs of seawater pumped hydro.
  • Better use of revenue from the grid sales for the community development.
  •  Investigate more strategies to attract more tourists along with hydro and makes Cumbrae economy much stronger.                                                 